Three Routes Served by Molecular Sieve for Biofuel and Biogas Plants
Drying beds for fuel ethanol, biomethane and hydrotreated oil, each held to a conventional fuel specification.
Quick Answer
Molecular sieve for biofuel and biogas plants is the zeolite adsorbent that removes water on three renewable fuel routes. A 3A bed takes fuel ethanol from the 95.6 percent azeotrope to the 99.5 percent minimum of fuel grade. 4A dries upgraded biomethane and the hydrotreated oil on HEFA units for SAF and renewable diesel.
- Zeolite 3A and 4A
- Media made by Medaad
- Crush strength to ASTM D4179
- Attrition to ASTM D4058
- Tapped density to ASTM D4164
Renewable fuel plants make standard fuels from biological feeds. Fermented sugar becomes fuel ethanol. Digested waste becomes biomethane, for the gas grid or for liquefaction as bio LNG. Fats and oils become renewable diesel and sustainable aviation fuel through hydrotreating. Each route ends in a fuel held to a conventional specification. Water is the impurity all three must remove.
A zeolite bed removes that water on each route. On the ethanol route the bed dries the product itself. On the biomethane route it holds the dew point the gas grid or the liquefier needs. On the HEFA route it protects a catalyst further along the unit. The three routes share little equipment.
Bead sizes and forms are listed on the 3A and 4A grade pages.
Ethanol Dehydration and Biogas Upgrading Units
SorbiTech Group builds the complete units around these dryers. The biogas upgrading unit takes raw gas through the guard, bulk carbon dioxide removal and the final dryer. Biomethane and HEFA dryers run on a thermal swing, as in the twin tower TSA dehydration unit. The ethanol dryer is a two vessel pressure swing unit. It regenerates under vacuum with part of the dry product vapour, and no heater is fired. Vessels and skids come from PuraSpecs, the group's equipment company.
Ethanol, Biomethane and HEFA Process Routes
Each route reads from left to right. The blue box marks the zeolite bed. The light boxes are the process units around it.
Where the Dryer Sits on Each Route
Each route makes its water in a different way. Fermentation and distillation leave water that boiling alone cannot remove. Anaerobic digestion yields a saturated gas, and upgrading leaves some of that water behind. Hydrotreating forms new water from the oxygen bound in fats and oils. In each case the zeolite holds water in pores that larger molecules cannot enter.
Bioethanol Plants
The rectifier delivers ethanol that still holds water at the azeotrope. A vapour phase twin bed unit follows the rectifier. One vessel dries while the other regenerates. The dry vapour then passes to denaturing and tank storage. Wet ethanol misses the blending specification and can separate from gasoline in storage. Recharging a fuel ethanol dehydration unit already in service is the most common enquiry on this route.
Biomethane and Bio LNG
Raw biogas reaches the upgrading plant saturated and carrying hydrogen sulfide and siloxanes. A carbon guard takes those out first. Bulk carbon dioxide then leaves through a membrane, a water scrubber or a pressure swing step. The sieve dryer comes last. In biomethane drying after upgrading, the bed holds the dew point the network operator sets for grid injection. Upgraded biomethane typically carries above 96 percent methane before it is dried.
Bio LNG needs more from the dryer. Water and carbon dioxide both freeze at liquefaction temperatures and would block the cold box. The dryer also removes the carbon dioxide that upgrading leaves behind. A plant that plans liquefaction later can size the dryer for that duty from the start. The liquefier and its cold end belong to the LNG sector.
HEFA for SAF and Renewable Diesel
Fats and oils carry oxygen, and the hydrotreater turns it into water. The high pressure separator removes most of that water but not all of it. The dryer sits between that separator and isomerisation, where it keeps moisture away from the cold flow catalyst. Renewable diesel and sustainable aviation fuel share this front end. One SAF and renewable diesel drying step serves both products.
Where light oxygenates survive hydrotreating, the bed gains a second layer for them. The unit also consumes a large flow of makeup hydrogen. Sites that make that hydrogen by electrolysis also need hydrogen drying, since the gas leaves the stack saturated.
Waste and Residue Feedstocks
Waste and residue feedstocks widen the contaminant list on every route. Used cooking oil and animal fat carry chlorides, phosphorus and metals. Feed pretreatment removes those before the hydrotreater, so they never reach the dryer. They still shape it, because a varied feed slate changes the water and oxygenates the bed sees. Landfill gas holds more siloxanes than digester gas, and its carbon guard is changed out more often.
A change in feed slate changes the duty on each bed. Size the beds for the widest feed range the plant expects. The guard beds around the dryer need the same check. Medaad, a group company, makes activated carbon, activated alumina and support media for those guards.
Related Renewable Fuel Topics
The choice between grades for each route is set out in types and grade selection. Heating and cooling steps for thermal swing dryers are covered under regeneration temperature and cycle. Carbon dioxide polishing ahead of a liquefier is described under CO₂ removal. Electrolytic hydrogen for HEFA units sits with hydrogen and carbon capture.
Questions on Molecular Sieve for Biofuel and Biogas Plants
Is ethanol dehydration on a sieve the same reaction that makes ethylene?
No. The reaction that makes ethylene is acid catalysed and removes water from inside the molecule. A sieve bed takes free water from around the ethanol and leaves the alcohol unchanged.
Why is 3A the grade for ethanol and not a wider pore grade?
Water enters a 3 Å opening and ethanol does not, so the ethanol passes through as product. Grades with a wider opening take up ethanol as well as water.
Why does a biogas dryer need an activated carbon guard in front of it?
Siloxanes break down on the sieve and leave a hard silica deposit in the pore. Heat does not remove it. The carbon guard takes them out first, so the zeolite behind it stays regenerable.
Can a small biogas plant dry biomethane on 3A?
Yes. On a small plant 3A can save energy because it regenerates at a lower temperature. Both 3A and 4A adsorb water and keep methane out of the pore.
What purge temperature does a HEFA dryer bed use?
A dry purge typically enters at 200 to 315 °C at the vessel inlet. It is kept below about 325 °C so the crystal is not damaged.
Quote for an Ethanol, Biogas or HEFA Dryer
SorbiTech supplies the drying charge and its guard media. The group also offers a packaged biogas upgrading unit. Name the route and the stream to be dried, with its flow, water content and product specification. Add the feedstock range, the contaminants measured upstream, the catalyst the dryer protects, and whether the vessels already exist.