Quick Answer

A molecular sieve dehydration unit is a gas dryer that works on two or more zeolite beds in turn. One bed adsorbs water while another is heated, cooled and returned to service. A feed bound for a cryogenic section is dried below 0.1 ppmv water.

  • Zeolite 3A, 4A and 13X
  • Media made by Medaad
  • Vessels and skids by PuraSpecs
  • Crush strength to ASTM D4179
  • Attrition to ASTM D4058

Request the TDS Request the SDS

A dehydration unit is the equipment that puts a zeolite charge to work. It holds the sieve in two or more adsorber vessels. Around them sit what the cycle needs: switching valves, a regeneration heater, a cooler and a separator.

SorbiTech specifies the grade, the bed depth and the regeneration duty. Vessels and skids can come from PuraSpecs and site work from FireBag, both group companies.

Most units dry gas on 4A, with 3A where olefins or acid gas are present, and 13X where CO₂ or mercaptans also have to come out. Natural gas dehydration is the most common duty.

Twin Tower Layout With Regeneration Loop

Figure 01 · One bed dries the feed while the other is regenerated by a heated slipstream of dry gas
WET FEEDGASBED AADSORBINGMOLECULAR SIEVEDRY GASOUTLETDRY GAS SLIPSTREAMREGENERATIONHEATERBED BREGENERATINGGASCOOLERWATERSEPARATORWATER DRAINEDSPENT GAS ONWARD

Bed B is shown on regeneration. The beds exchange duties at each switchover. Heated gas passes through the regenerating bed against the drying direction.

Where the Unit Sits in a Gas Plant

The unit takes gas that has already lost its free liquid in the inlet separator. Where the gas is sour, a gas sweetening unit often removes the acid gas first. Dry gas then goes on to the cold section.

Wet feedgasDry gas1InletseparatorProcess unit2AmineunitGas sweetening unit3Dehydrationunit4A media4Cold boxor NGLProcess unit
Treatment train · The dehydration unit, ringed, sits after inlet separation and acid gas removal and ahead of the cold section

Thermal Swing Cycle and Bed Switchover

Each bed passes through the same sequence. It adsorbs until its set time runs out, well before water reaches the outlet. The sequence brings the regenerated bed on line first and only then isolates the loaded one. Where regeneration runs at a lower pressure, the vessel is depressurised and later repressurised at a controlled rate. A slow pressure change keeps the beads from lifting and grinding.

Heating follows. The heater outlet temperature is ramped up, not stepped. It is then held while the heat front moves through the bed. Heating is complete when the gas leaving the bed approaches the inlet temperature. The heater is then bypassed, and unheated gas carries the stored heat out of the sieve and the steel. The purge typically enters at 200 to 315 °C. Most designs keep it below about 325 °C.

Cooling is the step most often cut short. A bed returned to service while warm sends a pulse of heat downstream. A cryogenic section sees that heat at once. A packed sieve also holds heat for days after a shutdown. The bed then waits on standby.

Scope Split Between Media, Unit and Site

A unit is designed to a performance basis written from the client's data. Scope is then split by item.

Scope itemUsually supplied byWhat it covers
Molecular sieve charge and support ballsMedaad, through SorbiTechZeolite charge and inert support balls for the vessels
Grade selection, bed depth and cycle timesSorbiTechWritten against the client's feed data and outlet specification
Adsorber vessels and their internalsPuraSpecs, where the order includes itMechanical design and fabrication around the bed the media design sets
Regeneration heater, gas cooler and water separatorPuraSpecs, where the order includes itSized for the regeneration flow and temperature in the agreed cycle
Switching valves, skid piping and control sequencePuraSpecs, where the order includes itStep times and permissives taken from the agreed cycle
Installation and commissioningFireBag, where the order includes itField execution on the client's site
Foundations, utilities, tie ins and regeneration gas supplyTypically client scopeBattery limits fixed at enquiry so each interface has one owner
Test documentation for the mediaSorbiTechIssued where the order provides for it

Bed Count and Regeneration Gas Supply

Two choices shape a unit before any vessel is drawn: how many beds share the duty, and which gas regenerates them.

Two Bed and Three Bed Arrangements

The twin tower layout is the common case, and the group's published twin tower TSA dehydration unit follows it. One bed adsorbs while the other regenerates, so each vessel carries the full flow. Large flows often move to three beds. In parallel service two beds adsorb together while the third regenerates. Velocity and pressure drop fall, and smaller beads become practical.

A lead and trim arrangement runs two beds in series instead, the second polishing what the first lets through. It keeps a second bed between any early breakthrough and the outlet.

Where Regeneration Gas Comes From

Most gas plants regenerate with dried product gas taken downstream of the beds. Where residue gas leaves an NGL recovery section, it is a common source. The spent gas then joins the residue stream or the fuel gas system, and no recycle compressor is needed. A closed loop returns spent gas to the unit inlet instead, and its water adds to the bed load.

Dry gas is the usual cooling medium. It flows in the heating direction, so the outlet end of the bed stays dry. Where wet feed gas cools the bed, the flow is normally turned to the drying direction. Any water it leaves then sits at the inlet end.

Related Guides for Dehydration Units

The steps for a charge change out are set out in loading and replacement. Why capacity falls over the years is covered in service life and dusting. Drying a gas that still carries hydrogen sulfide is sour gas dehydration, and the unit ahead of a liquefaction train is described under LNG pretreatment.

Questions on Molecular Sieve Dehydration Units

What purge temperature does a natural gas dryer use?

A natural gas dryer on 4A or 3A commonly takes purge gas at about 280 to 315 °C at the vessel inlet. Cracked gas dryers on 3A run cooler, at 200 to 230 °C, so olefin traces do not react on hot beads.

How quickly is the heater outlet temperature raised?

Gradually, over one to two hours. A fast heat up drives water off the bottom of the bed to condense in the cooler top layers, where it attacks the crystal and the binder.

What pressure drop is a dryer bed designed for?

Published practice designs for about 7.5 kPa per metre of bed, or about 0.35 to 0.55 bar across the whole bed.

How much capacity does a dryer charge lose over its life?

A common design basis for 4A and similar grades is a loss of about 35 percent over 3 to 5 years. The bed is sized on the capacity expected at the end of its run.

How is the remaining life of a charge measured on a running unit?

By a breakthrough test. A portable hygrometer on the outlet of the oldest bed records the time from the start of adsorption to a steady rise in dew point.

Feed Data for a Dehydration Unit Quote

SorbiTech quotes a unit around the media design: grade, bed depth and cycle. Vessels and site work are added as the order requires. Give the gas flow, composition, operating pressure, temperature and inlet water content, and the outlet specification. Add the regeneration gas the site can spare, whether a vessel already stands, and anything cryogenic downstream.

Request a Quote